MANUFACTURING
What we can take on
OEM and ODM: your drawings, your colours, your dimensions, full containers. Six core processes under one roof.
- Factory
- 30,000 ㎡
- Since
- 2014
- Processes
- 6, all in-house
0㎡
Factory area
THREE WORKSHOPS
0
Established
FOSHAN, GUANGDONG
0stages
Core processes
ALL IN-HOUSE
0continents
Export markets
EU · AM · OC · AF
01 / PROCESS
Six processes
01
Cutting
Aluminium cut to drawing, HDPE CNC-cut
02
Forming
Bending, punching, drilling
03
Welding
TIG welded and ground flush
04
Grinding
Deburr, radius all edges
05
Coating / Weaving
Powder coating or hand weaving
06
Packing
Hardware bagged, drawing enclosed



02 / EQUIPMENT
Equipment
Counts to be filled from the client's asset list.
| Machine | Qty | Use |
|---|---|---|
| CNC cutter | — | HDPE sheet cutting |
| Tube bender | — | Aluminium tube forming |
| TIG welder | — | Frame welding |
| Grinding station | — | Weld and edge finishing |
| Powder coating line | — | Aluminium finishing |
| Weaving station | — | PE rattan weaving |
| Load test rig | — | Finished goods testing |
03 / QUALITY
Four checkpoints
01
Incoming
Wall thickness, colour match, hardware spec
02
In-process
Weld quality, coating thickness, weave density
03
Finished
Load, stability, assembly
04
Pre-shipment
Carton audit, marks check, photo record
04 / LEAD TIME
Typical lead times
Peak season (Aug–Nov) adds 7–10 days.
| Range | Typical | Peak | Note |
|---|---|---|---|
| HDPE dining | 25–35 days | 35–45 days | Custom colour +5 days |
| Balcony | 20–30 days | 30–40 days | Hand-woven, per unit |
| Sofas | 30–40 days | 40–50 days | Fabric is ordered in |
| Shade | 25–35 days | 35–45 days | Canopy colours limited |
05 / AUDIT